Our WorkApril 5, 2022 - New customer. Starting a Hardi-plank siding job in Plympton on Oak st. Prefinished Artic white planking & cobblestone Board & batten hardi products including shingle planks as well. Azek trims.
March 23, 2022 - New customer. remove & replace interior walls & existing windows in Sharon on Lakeview dr. This is a brand new home. They were able to move in around 10 months ago. Now they are in the process of fixing what wasnt done correctly from the original contractor.
March 5, 2022 - New customer. Replace Fascia & soffit & roofing on a farmers porch in East Bridgewater.
Feburary 15, 2022 - Repeat customer. Remove & replace lally columns in East Bridgewater on North water st. This job was difficult. The main structural beam was 3" down in the center. upon cutting & digging out beneath the lallys, there was just a bag or so of concrete under the lally & the lally bottoms were sitting in water below the finished floor slab & rotted away. never seen that before. We istalled the appropriate footings, pumped the house up & added new lallys. good as new.
January 10, 2022 - Repeat Customer. Finish work in an existing home in Plympton on Bagheera rd. door & window trims, Basebord. Caulked & prepped for paint
November 15, 2021 - New customer. rip & replace 2nd floor full bath & rip & replace farmers porch in Quincy. updated electrical, plumbing. Soakers tub & custom tile work. Azek decking & railings.
September 7, 2021 - Repeat customer. Decking replacement work & windows on Washington st. in Whitman. Including structural rot repairs & custom Bulkhead replacement.
May 24, 2021 - Repeat customer. Ripping & replacing rear farmers porch in Brockton on South Leyden st. This porch has a 24x12 addition above & the piers are struggling to support the loads. All new Bigfoots. 2x10 treated framing, Azek trims, Azek decking & Azek railings. 2 sets of stairs. Came out Beautiful. Also did some work in the garage due squirrel inestations. Remove ceiling & replace. Close up the exterior entry ports.
March 15, 2021. Repeat customer. Ripping & replacing siding & trim in Pembroke on Matilda ave. Removing existing painted finger jointed claps & installing Certainteed grained vinyl siding. Quite a job. 3 stories counting the 3 full dormers on the 12 pitch roof.
Feburary 22, 2021 - New customer. Rip & replace 24 x12 1st floor deck in East Bridgewater on Batti Ave. using the existing piers we built a 2x10 pressure treated box, PVC trims & Azek decking. Azek white railings & new Anderson storm door.
October 5, 2020 - New customer. Starting a 24x24 addition in Plympton on Bagheera rd.with garage under. No lallys. 14" x 24ft. I joists. frame to finish. added a farmers porch to the detail. finished attic. Cedars with dog decals worked in. its gonna be the last job for this year.
7.20. 2020. Repeat customer. This job is in Duxbury, a complete exterior rip. Existing 2 layers of siding. top layer was cedars nailed to clapboards beneath & the sheathing was fiber board. we are putting Maibec pre finished cedars so the fiber board cannot allow the fastening of the staples so we had to remove the fiber board & then it was realized that this home had poor insulation values. We called Mass save & they were able to help us keep the pricing down.install 1/2" plywood as well. All new pvc exterior trims, rakes, soffits etc. 2 exterior doors & a 6ft. anderson Patio door. sweet. transformed garage entry & home with weaved corners throughout & cedar roof flares.
6.1.2020. New customer. Started a replacement window job in Weymouth. Boasting a beautiful garden window. 4ft. wide 5ft. tall. Bay window in the Kitchen & 15 windows & 3 Black entry doors. quite a job. the windows were already replaced 10 years ago but not installed right & cheap materials. We went with Harvey Classic replacements & Therma - Tru pre finished entry doors.
February 19,2020. Repeat customer. We are headed to Wareham for an addition. Permit was just released. lots of issues because of new flood zoning. This addition will be built on piers. 24x16. frame to finish.
Good morning on this wonderful day, sunny & a mild 47 Deg. on Presidents day 2.17.20. The project in Brockton was post-poned due to pet well being priorities. If you have pets, as I do, they depend on us just like the children in our life. So we ended up going to West Bridgewater for a mudroom project with custom built ins. Moved the laundry room to the 2nd floor & added a large closet to the mudroom. opened up the rear wall & added a entry door & small deck to access the back yard. Also a kitchen in Whitman, gutted & revamped. recessed lighting, custom cabinets,beautiful 8x16 slate tile floor & subway tile backsplash. Another project in East Bridgewater we remodeled a 28x14 rear room. demoed the floor to joists added coffin stye framing to accomadate r-3o insulation and this also keeps critters from living in your floor bays. This is common for floors that do not have basements beneath the floor frame. added baseboard heat, its 3rd entry door which accesses the screen room, T&G ceilings & walls with beautiful nuetral colors for the sun to dance on. We are going to Wareham next for a 14x22 addition on Sippican RD. this built on bigfoot piers as well & will have the coffin style floor framing & T&G ceilings. 2 entries back & front & tile floor. they are a repeat customer as well. From there we will be going to Scituate to attach a deck to a pool with a sugar shack bar & plenty of room for guests. A siding project on Malinda lane in Pembroke. 2 story addition in Plympton. at some point we will be going back to South Leyden in Brockton. Call today for your free estimate on any of your projects. 617.462.2828
August 9, 2019 .My My My, Time flys, still at. lots of work, lots of grand kids. Its been a while since I have been sharing. we finished all those projects & more from the last post. this year we actually went back to the Kingston bathroom & installed a beautifully tiled walk in shower. we installed 18ft 6x6 timbers for Copia real estate in Hingham on Canterbury Ave. We went to Provincetown for a couple months to revamp a serious deck project. Azek decking & rails. Kitchen Project in Duxbury, Beam installments to open the rooms up, new anderson windows framed in on Indian trail rd. Roof in East Bridgewater, 3 layer strip, rot repair & new roof sheathing, complete Grace Ice & water coverage & a beautiful coating of Oyster Grey. We are headed to Brockton next. repeat customer that you can find in past posts on South Leydon in Brockton is having aa brand new farmers porch installed. The original is collapsing from the weight of the room above due to faulty structual posts & framing. we will make it like new with Azek decking & rails. Bigfoot piers & 10" tapered round columns to match the existing. Talk to you soon.
. November 12, 2017..since March we have had quite the array of projects. In Brockton we removed several wood framed basement windows that really didnt operate that well & reframed with pressure treated materials & installed glass block basement windows with vent. Trimming the outside with white pvc materials. Several projects in Hingham for another homeowner. Framing of a 20x12 pressure treated deck with 2 stairs entry, the homeowner installed the decking & railings, we removed exterior window, door & cornerboards throughout the house & replaced with azek trims, installed 20x24 cradle framing for pre-fab addition being added as 2nd fl.over garage. inside we added a 20ft. structural lvl beam to open 2 rooms into one, some built ins & installed custom cabinets & crown moulding throughout. In kingston, we turned a 1/2 bath into full bath at a condo complex. walk in shower, Full closet well maintaining composure to the unit. another job in Hingham was a 2 story with attic firewall that needed to be built in between a duplex that was being remodeled & sold. next was a deck in Marshfeild, had its own footprint already, so we had to modify & update the framing & added azek decking & rails & gate system, really sharp.. of to my town in East bridgewater we installed thousands of lineal ft. of interior trim. 3 piece poor mans wainscotting throughout the entire first floor & up the entry way stairs. Also a 3 piece crown moulding throughout same areas, prepped & ready tp paint, removed existing ballisters & replaced with rubbed copper ballisters, installed glass tile backspalsh in kitchen. on the outside we changed out the shutters & installed a pre painted 2 lite front door to match the shutters. Finally we are in Pembroke now. Removing & replacing all the existing exterior trim to azek. cedar work & rot repairs in the roof areas. Some of this damage is from the day the job was completed 27 yrs. ago missing flashings & seam over seams in the cedars above valleys & such. ok till next time.. Call today for your free estimate John. 617.462.2828
March 6, 2017..Wow, time is flying. I guess its been a while. Well we ended up doing the stonework on the gas stove insert. Came out very nice. Also a couple of additions on bigfoot piers, around 600sq, ft. each. One in Marshfeild & the other in Whitman. Quite a change with the deck in Plymouth, adding a pergola over the hot tub & making the deck an elongated octagon. Roofs in Brockton, East Bridgewater & South Weymouth were in the venue. A dazzling front entry in pembroke. Spring is coming, call today for your free estimate. John 617.462.2828
5.17.16 Late spring this year for growing. great for work if you are working inside. we have just finished a water damage that I looked at 4 yrs. ago in Brockton. Yes 4 yrs. ago. Removed paneling, sheetrock & had to re-frame areas to accept new board & 1x6 pre-primed T&G wainscotting throughout with pvc rams crown & new Harvey replacement windows, What a transformation. We also did a remodel in lakeville on a kitchen & adjoining hallway & framed in for a gas stove. Structural & beam modifications & T&G ceilings. The homeowner is going to install shiplap to walls & stone the chimney thereselves.. We are starting a deck in plymouth consisting of a 18x28 jacucci deck for stage one, including pvc decking & azek trims. There is an additional pool deck being done in the future. OMG. How is the price of composite materials. Just remember the price to install is still same & sometime a better choice. Especially for heights..no peeling paint. Talk to you soon.
Heyyy, 4.11.16 - 10mph wind outside from the SW 54 degrees. Spring really has not got here yet, but is approaching. We took care of the headers in East Bridgewater, almost did not need a sawsall after shoring all the weight up, they just crumbled apart. all set now. The homeowner will take it from here. We also did a couple of bathrooms in Abington in a pre 1900's home. Gutted to the bone & reframe the ceilings & some wall areas to make it level. New plumbing & electrical, everthing new & customized & looking nice. we are currently remodeling a cottage in lakeville by adding a beam to open up a kitchen & putting a 2 way gas stove in. It will have a 1x6 pine ceiling & stonework to accent the stove walls. Call today 617.462.2828
Happy Holidays. 12.29.2015. First day of snow & actually a little chilly out at 32 & sleeting here in East Bridgewater. Giving me some much needed day off.. It has been non-stop since last log. We ended up doing 5 different deck projects at the same residence in Pembroke. including pressure treated 5/4" x 6" decking, 2x4 fir railings & cedar ballisters. ready for stain. We also updated a 1200 sq. ft. condo in Stoughton on Island rd. Complete with new kitchen, tiled walls, floor & ceiling in new full bath, 3 piece crown moulding throughout & 2 piece baseboard system. From the 70's to 2016. We did go to Scituate & do the windows. Remove existing 50 yr. old double hungs, modify current opening for new Anderson double hungs, Pvc exterior trim, new interior trim. These rooms are going to notice a difference this winter with these windows. We are currently starting a structural rot problem. It will need to 2 new headers above the 2 sliders that recieve a valley rafter. Stay tuned
July 5th, 2015 - Well we did not ending going back to Scituate for the windows, it is postponed till late September. Since last checked in, we have done quite a few projects. 3 in East Bridgewater we replaced rotted sills on the foundation of a house on rt. 18 that was sold & the work needed to be done to finalize the deal. The are happily moved & the new owners are in. We also changed a 1st floor full bathroom on North Central st. into a 1/2 bath with elegant corner sink, toilet & washer & dryer. The existing cast Iron tub was removed including the wall in & around the area. Consisting of new plumbing & updated electrical. We removed a pre-cast staircase to the front door of a house, which was way out of level because it was installed on no footings on Wintefeild Drive & installed 2 big foots, 2x10 pressure treated frame & Azek trim around the box & Azek Morano decking. We also stripped the rails & decking of a deck in Stoughton on Tamarack Drive. We removed Pressure treated railing & Pressure treated decking & replaced with Azek decking with Cortex fasteners, Azek railing & Azek Gate. Very sharp.. We installed Azek railings in Whitman on Pine st. 13 rail systems & Azek gate. We are at a basement in Mashfeild on Montana Rd. where we have just gutted a kitchen that was finished 2 months ago & the sheetrock was getting moist & the floor was buckling so we took a look& the past contractor did not install a vapor barrier behind the wall & the rock is wicking up the moisture.. This was another contractor who was not on the up & up.We are going to Kingston on West st. to do a 20x14 deck with Azek decking & custom wood railings, then we are of to Matilda lane in Pembroke to do a couple more decks. Well I think we are caught up.. Call for a Free estimate today - 617.462.2828 or just go to customer contact & fill out the information & I will get back to you as soon as possible.
Its snowing out, yet again..March 28, 2015. 108.7" this winter so far for the 2014 -2015 years. Spring is in the air -- Much needed and anticipated. We have finished in Pembroke with the Basement remodel. 2000 sq. ft. of new space. Featuring 2 bedrooms, 1 bathroom, 2 Large living room areas, HAM radio room & new staircase, dropped ceiling & plenty of storage space.
We are currently working on Pleasant st. In Whitman on a Kitchen room remodel. We have torn the 28 x 14 floor up down to the existing joists & pretty much leveled the floor from a 5" deficit using the existing early 1800's structural bone mass as a structural casing that has bended & bowed from 1 season to another. Adding all the necessary elements that our ancestors missed out on, which is quite evitible but understanding due to the massive 12x8 beams & 4x4 posts, 2ft o.c. but they are on a feildstone foundation, available to insects & rot due due to the beam being inside the the foundation wall. The siding or trim sits on it & soaks the water in if not flashed properly. Now a days the walls hang out past your foundation for shedding water. Anyways we are past that & haved reframed the ceilings the same way. Leveling the walls out & moving on... We are going back to Scituate next to do some windows. New Anderson windows, Pvc trim & White cedar siding. Another job on Washington St. in Whitman is going to be trim work & white cedar siding. Rip & replace.. Talk to you soon
Hi Folks, January 24, 2015 Its snowing with accumulation possible. First time this winter.. The Basement has been moving right along, Framing, rough electric & plumbing, insulation, blueboard and we are now finished with the plastering. Nice job done by Matt Gomes.. Doors are coming Monday morning, 15 in total. Pre-primed split jamb, solid 6 panel Ponderosa pine. We will get all the doors in & start painting. Looks like a busy year ahead. Call today for your free estimate.
November 24, 2014. Happy Thanksgiving. We did some repair work on Whiting st. in Hanover for a repeat customer. New double barn doors, trim repairs, etc.. Currently working on Grove st. in Scituate on a roof. Lots of rot issues as you can see in the pics. They are also going to be doing windows now as well. White Anderson double hungs inside & out with White extensions, no painting ever.. Are next job is in Pembroke on Malinda lane where we are doing a 2500 sq. basement remodel. Call today for your free estimate & get in line for your next project..
October 23, 2014. 50 degrees & a nor-easter on hand. 2-3 inches of rain last couple of days, winters coming soon. It was a busy summer. At 1078 Washington st. in Whitman we put a facelift on the front of this 1825 colonial, New Harvey replacement windows, rip & replace window trim with Azek trims, old basement windows covered with plywood & boards over the years ( you know the ones ) letting no natural light in the basement, brought back to life allowing 324" of life to a dank basement. The front was scraped, primed & painted using Benjamin Moore paint products.
Also worked on South Leyden again in Brockton on another project. Robert ( homeowner ) has been wanting to take care of this for a while. Squirrel infestation moved it more quickly along. We replaced all the fascia,soffit & gutters on his pre-1900's 2 car garage, with Azek 1x10 & 1x8 trims & 5" seamless aluminum gutters. Discovery of rotted 6x8 upright beams & 6x8 sill beam damage led us on another quest of fabrication & modification.
Another job on Washington st in Whitman was rip & replace of a bedroom ceiling. This building used to be the original town hall. The plaster & lathe ceiling was collapsing. We removed the plaster & found 2x4 spanned from 6x6 beams at about 3ft. centers. Through the years of walking above everthing loosened up. We reframed the ceiling & sheetrocked & compounded the ceiling & added a Rams crown all the way around.
We ripped & replaced portions of the roof at the Channel 9 community building in Whitman.
Ripped & replaced cedars on Pond St. in Bridgewater.Replaced them with Maibec Grade A pre-primed white cedars. Expensive but a great product. If you are thinking about a home Improvement project, call today... John 617.462.2828
June 13, 2014. Now I am just losing track of time. Trinity church is all done. Commercial kitchen & bath & 24 x 50 dining room to serve 100's of parishoners & friends during those spaghetti dinners. The basement in Bridgewater is framed & getting roughed for electrical & plumbing. Then we will get an inspection so it can be insulated. We also did a face lift on the front of a home in Hanover built in the 1850's on Water st. Removed the existing cedars & Installed Hardie-pank color-plus. (Sage) New Pvc Fascia, Soffit, Cornerboards & window & door trims. Changed the entry door from 32" to 36" and topped it off with traditional black louvered shutters. You cannot miss it. Front stairs in East Bridgewater was another venture. Some old walls & ceilings in Brockton were torn down & insulated ( no insulation in walls or ceilings in these rooms ) sheetrocked & plastered. There are so many homes that are improperly insulated or not insulated at all. Imagine the money you are spending to heat the house ? $4 a gallon for oil.... Call today for your free estimate.
January 15, 2013. Beautiful day today, 50 degrees. You have to love living around here, 2ft. of snow 2 weeks ago & frigid weather to a balmy early spring day. Trinity church in Bridgewater just passed all rough inspections & is getting blueboarded & plastered starting tomorrow. This is a big one 175 12ft sheets of 5/8". The ceilings throughout are double 5/8". A level five finish plaster will be applied. Next is interior finish & looking forward to this phase, it has been a lot of work to get to this point. We also did a 10x12 deck on Harmony crossing in East Bridgewater. This is my second in the over 65 community of Harmony's Crossing. Spring is coming fast,we have a residential basement in Bridgewater, a kitchen in Weymouth &a possible siding & trim job in Hanover on Water st. Got some interior stair railing to do in Brockton. Call today for a free estimate on your next project. 617.462.2828
November 6, 2013. Evening everyody. How bout that Pats game against the Steelers this past Sunday..YES.. We finished up in Abington & Also put 11 footings in a basement in East Bridgewater for a 1850's cape on Washington st. complete with cement filled lally columns. Replaced decking on a 40x14 deck on Sachem rock ave. in East Bridgewater. Trex to Azek.. with the hidden fastener option. Just finished my neighbors roof, 2 layer strip on a 1960's ranch that needed a desparate hair cut. We are starting to strap the ceilings at church & start getting some metal stud framing going. This has gone to a complete basement remodel, everything is being done over.. what a project. If you are looking a professional, committed builder call today for a free estimate. John 617.462.2828
Good morning folks, August 18, 2013. I apologize for slacking in the blog dept. It has been one of the busiest years in a long time, I had a couple of weeks off & boom, everybody called at once. I just finished another bathroom in Whitman center on Washington st. Full gut job including the floor joists, the cast iron tub was ready to fall in the basement. We added Anderson awning windows and a carribean color scheme & carribean floor tiles.
I am also working at the Bridgewater Trinity church, another complete basement gut. We are adding a commercial kitchen & unisex handicap bathroom, new anderson windows, this is quite an area, boasting some 2000+ square ft. Politics in the church forum are making this job move at a snails pace.
The main job at the moment is addition remodel in Abington on Shaw ave, completely gutted & getting a new look with T & G ceilings & walls, new Anderson Tilt wash windows, pvc trims & including a pocket door. Also working on footings & lally columns in East Bridgewater on Washington St. Other jobs in the making, another deck job on M street in South Boston, Also working on my own deck with screen house and stainless steel cable systems for railings. Call today for your free estimate.
Good morning to the South Shore, Spring is in full swing. Just got my peas in the ground & all my vegetable goodies are ready to come upstairs & be planted. How does your house look ?
Take a walk around before all the foilage fills in & take good look at your siding, trims, how are the gutters ? Maybe a new slider going onto a new deck ?
No matter what your project, give me a ring, we will meet and look at your project and work with you, on trying to start & completing your project in a timely fashion with quality workmanship. Call John 617.462.2828
Hi Everybody, April 2,2013 - All set in Boston. We also did a bathroom on Central st. in Whitman. Full gut, new plumbing & electrical upgrades, very nice transformation. We also sheetrocked a couple of ceilings in the same apartment & installed Rams PVC crown. Another job was on Harvard st. In Whitman, we removed interior walls & installed beams for open floor plans. Another job was a water damage in Whitman at the luxury apartments at the old rope factory. I like when all the work is an general area, it is a treat to say the least. I am currently working on a 850sq.ft. deck in East bridgewater, Complete with a 12x16 screen house & 3 sets of stairs & privacy walls & stainless steel cable rail systems. Other jobs I have looked at are a white cedar siding, rip & replace in West Roxbury. A roof in Bridgewater, rip 3-tabs & replace with architects. A couple of door & window projects in Brockton.
Call today & get your free estimate, what is your project...
Febuary 4, 2013. Good morning folks, Spring is just around the corner and I am looking foward to getting my veggies growing. We are currently working in Boston on Columbus Ave, A basement condo renovation. Gutted, reframing, blueboard with Iso-trax installed to ceilings for soundproofing, plaster & new solid wood floors & all new baseboard & window & door trim. I have left 626 Broadway in Hanover again, a second floor addition, new roof to rear of home, windows, trim & siding. We are going back in the spring to build a 24x60 carport and work on the in-law section of the home. We also did a roof on 1080 Washington st. in Whitman, this is a layover and boy is it steep, 14 & 18 pitch, it is like doing a sidewall. The bathroom in Norwell is finished. Custom surround tiling in the shower with a jacuzzi tub. We have also just gutted a bathroom on Central st. in Whitman, we actually did a roof for these folks back in June 2012. I have also been working on my deck, I bought this house 10 yrs. ago and the deck is the last project. Remember folks call today for your free estimate & book now for an early season start.
November 8, 2012. Hi Folks, Another northeaster here. Just a week after hurricane Sandy, let us thank our emergency crews for getting our power on & our roads clear.
We are finished in West Bridgewater on Crescent st. This roof looks amazing. It desperately needed a new roof, 12 & 14 pitch with cut valleys and ridgevent. We also did a window job on Standford hill rd. in Pembroke. Remove existing windows & replace with Anderson tilt-wash 400 series, 1x6 pvc exterior trim, foam insulation & new trim inside. These folks are repeat customers. Currently, we are back on Broadway in Hanover, working on a couple of additions to make the home functional & appealing. This project is a frame to finish & the owner participates with the daily work load. A bathroom is signed on in Norwell, we actually did a front deck for these folks back in 2008. What are you looking to do ? All you have to do to start is call for a free estimate.. I can make it happen, we show up & get the job done. Quality work, Quality products, & the feeling of your own personal carpenter.
10.12.12. Hi Everybody, fall is here & winter is not far away. Since I last checked in, we finished the mahogany deck in South boston with cedar rails, privacy wall with mahogany lattice. Nice stuff.. We went back to Broadway in Hanover and installed Harvey classic replacement windows, Factory colored Hardi-plank & various Azek trims. We did another deck in East Bridgewater on Harmony way, Azek decking & azek railings. We just finished a floor repair in Brockton on Leyden st, we had to install footings in the basement, tear out the beams & floor joists and replace. We are now doing a 40 square roof in West Bridgewater on Crescent st. Remember free estimates, Quality work and accountability...
7.21.12 Wow, I guess I have lost track of time, that can only mean one thing. It has been busy, we worked on the Hanover job till about the middle of June. The owner is thinking of adding an addition & we will be going back there in September.Then we did a roof on Central st. in Whitman, 3 story with a dormer & 2 layers of shingles - rip & replace with Landmark 30 yr. architects. Grace Ice & water, 30lb tar paper, 8" aluminum dripedge entire perimeter, windnailed. We also layed a patio deck atop a rubber roof on Harvard st. in Whitman, 5/4 pressure treated decking used for the sleepers & decking, including a perimeter boarder. Spent a couple of weeks on past job in Duxbury on Grandview ave, some custom fencing, re-decking the dock with 2x8 pressure treated deck boards - 180 5 footers, pre drilled & screwed. Now we are in South Boston working on a deck 16x12, mahogany decking & rails with red cedar trims & t&G red cedar privacy walls & weathered proof underneath to put all those wonderful outside things away for the winter. Stay tuned for some photos in the upcoming weeks. Call today for your free estimate on your future home improvement project. 617.462.2828.
5.28.2012 Hope you had a good memorial day. Currently, we are working in Hanover on Broadway ave, look for the Sterite construction sign. You will notice that we are there every morning and each day shows progress towards the completion of the project. This one is getting a new roof, rip & replace. We have added stairs to the 2nd floor and framing a 2 bedroom, 1 bath remodel. New windows & updating the electric, plumbing and heating system. And much more.. Whats your project or home improvement adventure. Call today for your free estimate 617.462.2828 ask for John.
Good morning on this beautiful day April 17 2012 All set for now in Sandwich Mass, Loading up the truck and heading to North Weymouth on River St. for a roof strip & replace. Springtime is a good time for Decks, siding & roofing, pretty soon all the areas around the house will be covered by the plantings and just plain growth. Now is the time to go outside and see if you need some work done and give me a call for your free estimate.
Hi Folks, April fools day. We just finished up a 16x28 deck in Pembroke on Standford hill rd. We did use the Azek decking and ending up using Azek railing, Azek gate. added a bumpout for the grill and put the hot tub right on the deck. We also went to South Leyden st. in Brockton to bring an old gable back to life with Azek trims & stock color hardi-plank and added a little chicken wire to keep the critters out. Prior to us doing the gable there was a squirrel living in the trim. An Arborist was called in to cut the branches to the house. We are going to Sandwich on Academy rd. for rip & replace white cedar siding and then to North Weymouth for rip & replace roof, with a skylight and gutters and downspouts. Call today for your free estimate.
It was a cold chilly morning, 14 degrees. March 6, 2012. Thats a little more like winter, but a worthy 38 by noon. Tomorrow is forecasted to be 60 and sunny, very nice seeing as we have 11 sona tubes with big foots to pour for the brand new 16x28 deck with Azek decking & Timber tech railing system and a new Anderson Patio door. We have vinyl sided a garage in East Bridgewater and added some windows, this job required a permit. Just to let you folks know, the rules are changing and if you want to be protected, you need to check if your project needs a permit. Currently the deck we are doing is in Pembroke on Standford hill rd. Then we are headed to South Leyden In Brockton for phase 3. Talk to you soon.
Tomorrow we are expecting temps in the 60's
Morning everybody, February,15 2012. Cloudy & approaching 50 seriously, this is the warmest winter In my 30 yr.career.. You can actually still put footings in for decks, the frost level is less than a couple of inches.
Call today for your free deck estimate.
We have the fascia, soffit & gutter all set on South Leyden st. in Brockton. What a tedious couple of weeks, very messy. This was ripped & replaced with 10" soffit with vent, PVC fascia board, 6" white gutters & topped off with leafguard. We have now given a gasp of breath to an old attic & detail for the eye to follow around the house. We finally got the basement windows in for Whitman they took almost 6 weeks for delivery. They are installed & we are looking foward to some future work there. Talk to you soon.
Hi Folks, Jan. 17, 2012. We are all finished on Sagamore dr. in Brockton. Looks like we are going back in the spring to take down an existing shed & putting another one up. (Yes, we do sheds too, simple to extravigant just like our deck policy), We are headed to South Leydon in Brockton. Tomorrow morning I am heading to Hyde Park to look at a hardi-plank siding job on Beaver st. Also waiting for the basement windows in Whitman to come in. Talk to you soon. John
Hi everybody, Janurary 10 2012, Happy New year. We are currently working on a roof on Sagamore dr. in Brockton. We work thru out the winter, whether it be outside or inside. Next we are doing the pantry on Dons rd. in Middleboro, complete with some cabinets and oak flooring and custom shelving. After that we are going back to South leydon in Brockton to start on phase 2, rip & replace fascia,soffit & rafter end replacement with 6 & 5 inch gutter replacements with gutter guard. Other jobs in the works are a roof in Bridgewater. A possible interior demo job in Marshfeild. we offer free estimates and prompt return phone calls & e-mails. Call today 617.462.2828 and ask for John. Thanks and have a great day
Hi Folks, Dec 30 2011, Happy holidays everyone. It has been a couple of busy months, We are finished in Duxbury and have been asked to come back in the spring to work on the front of the house. Basically we built a 1500 sq.ft. deck with 5/4 by 6 inch mahogany for decking, composite trims and stainless steel cable railing system. 4-8ft. anderson gliders, 8 anderson storm doors. 10 anderson windows, red cedar roofing and maibec nantucket A grade white cedars. This was quite a job. Next we went to Yarmouth ave in Brockton to tear down a 7x12 porch entry and built a 16x12 addition, which included 4 big foots and 6x6 carrying beam, 8 pella windows, 2 anderson storms with separate pressure treated stair entrys, 1 for access to the backyard and 1 from the driveway. The addition is maintenace free on the outside, boasting Azek trims and vinyl siding with lattice surround to keep out those pesky critters. we also went to Whitman on Washington st. to install a couple of hopper windows and basement window wells due to the water that was coming of the roof and running into the basement through the existing basement windows, which may have been done in 1853! yup, 1853 they looked it too. It looks like we will be going back here in the near future for some projects. We are going to Middleboro, Dons st. to do a 12x5 pantry by using some unused space in the building plan. It will be a nice addition to my photo gallery. Remember folks, we are at it all year round, inside or outside, in the attic or in the basement and every place through out you home. You can feel confident with Sterite construction on your side. Thanks and hope to hear from you. John Sterite
Afternoon Folks, Oct 6, 2011. The roof is done on Pond st. We ran into some gutter issues, and poor ventilation. The roof was a lay over on a roof that was in really bad shape to begin with and had no paper or ice & water, improper flashing, the roof was applied and all the joints were tarred & rot repair from those issues. As far as gutters go, I like to allow 3/4 inch per 8ft. for pitch, sometimes you need to evaluate in the field + or -. We are back in Duxbury and will have some great photos, soon. Feel free to comment.
Good morning, Sept 8 2011. We are waiting for the rain to break to start a roof & do some siding in Bridgewater on Pond st. We finished up phase 1 on the Brockton job on South Leydon, this ended up being a repair that could have been prevented if done right the first time. Instead, they covered everything up with metal and called it a day. We are going back to Duxbury in a couple of weeks. Give me a call and lets plan your next home improvement project.
Hi Folks, August 15 2011 9.13 am Raining hard. Fall is a month away. We are taking a break from Duxbury. The homeowners wanted to enjoy there deck for a little bit of the summer. We worked on a deck rot repair and 2 sets of entry stairs in Milton on Spafford st. a repeat customer. Installed a walk-in shower in Whitman, tiled floor with 3 piece surround and crown moulding at ceiling. Hand stained trim & cedars at a home in Bridgewater. This week we have a couple of days in Weymouth, ripping & replacing some leaky cheeks on the roof, a couple in Quincy, another roof repair, the dormer was not flashed correctly 5yrs.ago when replaced has caused some pretty extensive damage to a farmers porch below. We are going to Brockton next week to replace facia, soffit and gutters to a 140 year old home that the owners have decided to bring it back to its natural vigor.Then its off to Bridgewater for a rip & replace roof and some siding. Remember, call today & get your free estimate.
Hi Folks, June 10 2011-- Still working on Grandview Ave. in Duxbury. 2000 sq. ft of 5/4 x6 mahogany decking with azek trim & decorative details. We have a busy summer ahead and are looking to start booking for the fall, call today and lets get together & discuss you next home improvement project.
Evening everybody, Saturday 6pm May 7. We are finishing up a roof in Hingham at 38 Highview ave. Totaling over 65 square of 30 yr. architectual Certainteeds, lead-coated copper valleys & drip-edge, another project right on the ocean. We are going to Grandview ave. in Duxbury next week for a complete deck makeover. Stay tuned for this transformation. We are looking at a roof on Crescent St. in West Bridgewater. Other jobs on the list are rot repair on a farmers porch on Spafford st. A bulkhead in Whitman and a roof repair in Quincy. We are also doing the siding on the 38 Highview ave job. Call today and let's talk about your next home improvement project.
Afternoon Folks, April 6,2011 - - Rainy & windy today. Looks like the season of spring is off to a good start. Made my garden boxes this past weekend, ready for a bountiful garden.
We finished up on Otis st. Hingham, mass. It was 10 square of white cedars & trimwork, including some rot repair to a couple of sills. We are starting a 60 square architectual asphalt roof on Highview ave in Hingham, they picked Moray black certainteed. We also have the siding, which will be white cedars, consisting of weaved corners, flairs and specialty designs. I am looking at another siding job on Gannet rd. in Hingham, also a possible deck project on Grandview ave in Duxbury. A Therma=tru front door with left & right side lights was ordered for Spafford st. in Milton. It has a 6-8 week delivery status. Always be prepared for Doors & windows, especially if not a stock item.
Good morning, Saturday, Feburary 12.. We are finished with the addition. on middle st. in Weymouth. Frame to finish, all the bells & whistles. Including 2 skylights, 8 suntubes (velux). Toungue & groove ceilings and walls. cherry laminate through out. 90 days. We also did some interior trim on Arthur st. in Whitman, wainscotting and chair rail for the stairs and dining room. We are headed to Otis st. in Hingham to rip & replace the siding and trim of the rear of the home.
Morning folks, Wednesday, Dec.15. 18 degrees with 15 mph wind. I just worked 17 days straight, I am taking the day off (not working AT the job anyways) We finished in Scituate. All said and done, the roof was 58sq. architecual asphalt with 140' lead coated copper valleys, hundreds of ft. lead coated copper drip-edge, all made right at the site. The siding was Grade A R&R White cedars (Purchased from Cape cod lumber, best price & nice quality) which totaled out at 60sq. Including Weaved corners, the wave & 2 specialty designs all done in white cedars.
Nov.1 2010. We started an addition on Middle st. in Weymouth. Tearing down a 7x19 sunroom with a 2 pitch that leaks, has had many a tradesmen taking a whack at dolling it up, to no success. We are adding another 7ft. out and calling it 14x19.
Hi Folks, Sept 30. For the folks who were looking to see the updated photos, I apologize. my computer has been on the fritz. Currently, we are in Scituate on Collier ave. complete roofing, siding and a compass rose on a gable with the wave, blended together using White cedar shingles.
Hi Everybody, It's Labor day, 2010. Summer will soon come to an end and Fall will open the doors for Winter. Last Winter we were building a garage in Hingham on Bonnie briar rd. Since last checked in, it has still been busy.
We went back to Sea ave in Quincy, Installed 14 anderson 400 series Tilt wash windows. Labor included, removing existing, reframing for new construction, prep & install new.
Installed the Kitchen cabinets and trimmed out rest of Kitchen in Easton. They were ordered from Kitchen sales in West Bridgewater. Nice stuff.
Built 6x36 Farmers porch in Whitman on Benson st. Including roof framing. wind code specifications. Azek decking & Azek trims. Yard master composite railings.
Remodel of sunroom at Benson st, Whitman. Including, new wiring & relocation of washer and drier. Installation of 5 anderson 400 series Awning windows. frame to finish.
Interior trim work on Belmont st. in Whitman. which included 800 lineal ft. crown moulding, rail & band mouldings.
48 sq. roofing job in Scituate on Collier Ave. Including lead coated copper, drip-edge, valleys, flashing. Affordable, in an area where aluminum does not stand a chance against the salt from the atlantic.
Currently we are siding in Scituate on Collier ave. White cedars, including weaved corners, flares and the wave.
Hi Folks, 10.30 am Thursday June 3, 2010. May was a really busy month. We started the kitchen in Easton, got it to the stage for ordering cabinets and they should be in on 6/20. You should always plan ahead for cabinets, in this particular case, it's an In-law addition, so they have access to main kitchen.
We finished up in East bridgewater for the time being, cedars & hardwood flooring, they are going to have us back in the fall for some more projects. We then went to Quincy on sea ave.(houghs neck) and installed 350ft of LVL beams and hung the 2nd floor to them, tore down a 4 story chimney, removed a 100 yr old framed 36' x 10 3 layered floor and the joists and replaced the framing and framed & installed 2 anderson 6ft frenchwood gliding doors. That leads us up to today.
Good afternoon, April 27, 2010. Raining, chance of some snowflake. I Know huh.. We finished up in Plympton & went back to Easton on Depot st. & ended up doing a first floor remodel. Thats finished and now we are doing their kitchen. Some of the other jobs we are looking at are a home remodel, Sea ave in Quincy.
Hi folks, March 31, 2010 beautiful day, Wow, time is flying as usual. We finished up in Hingham, happy customers I might add. Then we went to Marshfeild and put a roof on a garage, fabricated by Homestead sheds, then we we went to Easton, 2nd floor room remodel with skylights, fluted trim throughout and Bamboo hard wood flooring. Very nice.
Good morning, it is wednesday morning Feb.24 and raining out. They are saying 4 days worth. We are just about finished with the garagr in Hingham on Bonnie briar rd. We have a couple of small jobs to take care of. Weaving some corners with white cedars in Hingham,Foley beach rd.. Kitchen window in Plymouth. I also looked at some work in Plympton on Grove st. A building in Middleboro, the owner wants to make 3 one bedroom apts. out of there existing property. This is a nice project.
Good afternoon everybody, Tuesday Dec, 22 09. We just had a major snowstorm Saturday night. 2ft. here in East bridgewater. Didn't stop us from going to work Monday and shoveling our work area out and getting some work done though. Marshfeild is coming to an end and what a transformation. Right now we are decking the decks with Mohogany 5/4 decking. 3 1/2" & 5 1/2". We also did some siding on the last few weekends on Thompson st. in Hingham, primed red cedars with outside-inside weaved corners.
we are going to roof & side a garage in Hingham on Bonnie Briar rd. next and then another siding job on Rockebye lane in Hull. We work right through the Winter if you have a project that you want to get working on give me a call and lets see if we can work something out. Thanks and check in soon.
Hi Folks, Wednesday. Nov. 25, 09. I can't believe it's been 19 days already. We have been working straight thru. Marshfeild is ready for inspection on sona-tubes for 2 decks, 6x8 2nd fl. & 16x12. Also, the original 6ft. slider was moved upstairs for the 6x8 and 10ft. Pella slider was installed for the 16x12 which opens in the center panels, very nice door.
Inside trim is 4" & 3" Victorian style pine trim from Loews and required 1 coat conditioning & 2 coats for the stain, which was a waterbased stain from Minwax called Rosewood.
We also went to Plymouth, opening up a wall for a kitchen and installing a 6ft Pella slider and trimwork to the fireplace & a new kitchen window.
We also framed, insulated & installed Texture 1-11 for a bathroom in Kingston, and we went to Hingham this past weekend & did some siding, consisting of stained red cedars with weaved outside & inside corners. Happy Thanksgiving.
Hi Everybody, Friday. Nov.6,09. Wow, where has the time gone? We are 2 full moons away from winter. The Marshfeild job is coming along quite nice, We finally got the permit last week ( 1 month ) digging is going to be tough. Code for the Marshfeild area requires a "big foot" under the sona-tubes for the decks because of the new code for 110 mile per hr. zones along with a new prescriptive residential deck construction guide. I know it sounds pretty intimidating, just the rules.
We will be working on weekends as well in the next couple of weeks in Plymouth on Deidre lane. Other jobs we are looking at are in Duxbury for a kitchen remodel, siding in Hingham for a contractor and also a roof in Pembroke. Feel free to contact and let me know what project you are planning on doing.
Hi Folks, Friday Oct. 15.09. A good loe nor'easter is rolling thru. The Marshfeild, Moraine rd, job is moving along quite well despite mother nature and still waiting for the permit to build the decks. The barn board is all off, soffits & rakes are chaulked & primed. Most of the trim is on & we have some siding on. Next week we will be embarking on the windows, one of them being a 10' x 6' Pella bow window.
Go Pats, 10-4-09 . Today I looked at a job in Quincy on Lind st. and another in Plymouth on Deidre rd. The project in Quincy is a rip & replace roof, adding Fascia and replacing rotted rake boards. The plymouth project consists of new slider & pre-finished oak floors in the kitchen, kitchen window replace and open floor plans. These are just some of the many projects that we just might be working in the upcoming months and maybe yours.
Hi Folks-Oct 2,09-What happened to the summer, We started the job in Marshfeild this week on Moraine rd. The project consists of, priming, chaulking & painting of existing rakes & soffit. All cornerboards, window & door trim to be replaced, barnboard removed & replaced with Maibec bleached "A" Grade white cedars. bow window installation, 4 additional windows and 2 sliders. 6x8 2nd. fl. deck with Azek trim and Mahogany decking & composite railings. 10 x12 deck with a few stepdowns to 5x8 decks, also complete with azek trim and Mahogany decking.
Good morning - Sept. 20. 1pm We are on Grove st. in Norwell Stainless steel ring nail & fibercon railings. Probably have 3-4 more days & we are off to Marshfield, on Moraine rd. Yesterday morning before work I had to look at a job in Easton on Foundry st. R & R roof, wow does it ever need one. This morning I looked at a job in Stoughton, basement remodel, with possible beam replacement to get rid of the lally columns in the basement
Good morning - September 16 -- We finished in West Roxbury, 21 windows needed new trim, picture frame style. Today we are starting In Norwell on Grove St. 7x20 front entry deck with mahogany decking & composite railings, along with 3 new doors and beam rot repair.